Residential and office building "Vinzent", Munich

Completed 2025
General Planning
Location: Munich
Topics: Residential, Office, Timber Construction, Climate-friendly design, General planning
Investor: Bauwerk München 22 GmbH
Gross floor area: 21.640 m²
Servicephases: LPH 1–7
Wood facade with integrated planters

In Munich's Neuhausen district, at the heart of the St.-Vinzenz-Viertel, Vinzent brings living and working together within a single architectural ensemble. The project combines high-quality design with sustainability and economic efficiency, while setting a benchmark for urban timber construction. As one of Munich’s first projects of its kind, it completes an existing perimeter block using a hybrid timber and reinforced-concrete construction system.

Site plan

The scale, proportions and heights of the individual building volumes have been carefully articulated to integrate the development into its historic context. The design clearly distinguishes between residential and office. Each volume responds precisely to the specific functional and spatial requirements of its intended use.

Section
Axonometry

The residential building is supported by a reinforced-concrete frame, while the office building is constructed using a hybrid timber structure. Both buildings have a prefabricated, ventilated timber façade that extend along Gabrielenstraße and Rupprechtstraße. Their color palettes and façade rhythms establish a clear identity for each building.

Blue-grey, ornamentally milled timber façade
Green, vertically profiled timber facade


The blue-grey and green color scheme, together with the differentiated vertical articulation of the façades, creates a dialogue between the new development and the surrounding Wilhelminian-era architecture. Horizontal façade bands and solid plinths draw on the established architectural language of the neighborhood, translating it into a contemporary expression. At the intersection, a taller, accentuated building corner strengthens the architectural identity of the urban block while marking the development as a new focal point within the quarter.

Ground floor
Upper Floor 02
The raised building corner creates a urban landmark within the neighbourhood
Vertical section of the office building

Green façades and a densely planted inner courtyard enhance the urban microclimate and promote local biodiversity. Integrated planter boxes in the facades form part of a soil-free, water-based greening system, enabling vegetation to become an integral component of the architectural design.

Realization:

Stetter, Veronika (Team Leader)
Mehlert, Claudia (Project Leader)
Moosbrugger, Matthias
Adler, Jakob
Bäcker, Hans-Christian
Birke, Helge
Blum, Viktoria
Burkhard, Flo
Choi, Yunhee
Diaz Gómez, Angela
Jantzen, Katja
Karahan, Özge
Klein, Juliane
Lei, Jie
Mayer, Elisa
Mühle, Lukas
Nieberle, Magdalena
Park, Justina Yun-Ju
Peneva, Elena
Pérez-Albert, Pablo
Pröbster, Rebecca
Seidl, Maximilian
Weyer, Johannes
Wiener, Michael (BIM coordination)
Wüstemann, Lars (BIM Koordination)
Zou, Shixian

General Planning:

Comito, Daniela
von Mosch, Alexandra

Feasibilitiy Study:

Gradenegger, Ulrich (Lead)
Mühle, Lukas

Specialist planners:

Leitwerk AG, Munich (Tender Documentation / Contract Award)
Seidl & Partner Gesamtplanung GmbH, Regensburg (structural engineering / building services / specialised civil engineering)
Schüller Landschaftsarchitekten, Munich (landscape architecture)
hhpberlin Ingenieure für Brandschutz GmbH, Munich (fire safety)
PMI GmbH, Unterhaching (building physics)

Photography:

Kim Fohmann